A 19-person practice in Oakland and Portland designing houses, small hotels and workplaces, and developing a few of our own.
Gum Tree House, Lafayette, California · 2025
We take on nine or ten commissions a year. Each one starts with two visits to the site and ends with a return visit twelve months after handover, because that is when a building tells you whether it works.
Most of our clients are owners and operators who will live or trade in the building for decades. A few are developers who think the same way.
Eight projects from 2021 to 2026. Drag, swipe or use the arrow keys.
08 projects, 2021 to 2026
Scroll sideways through the projects with arrow keys, swipe or the buttons.
Sector, scope and status for every project we are allowed to show, including six not in this reel.
Open the project indexFour stages, the same on a 640 sq ft cabin as on a 22-room inn. The durations are typical for a new house.
Stage 01 of 04 · 3 to 5 weeks
We start on site, not at the desk: two visits at different times of day, a measured survey, soil and zoning checks, and a long conversation about how you live or trade. The brief we write back is eight to twelve pages, short enough to argue with.
Stage 02 of 04 · 6 to 8 weeks
Schematic design happens in card and basswood at 1:100 and 1:50. People read a model they can lift the roof off much faster than a rendering. We build three options, then one, and price it with a builder before going further.
Stage 03 of 04 · 10 to 16 weeks
Permit and construction drawings are where budgets are kept. We detail every junction we expect a builder to price, and schedule finishes, fixtures and joinery so that tenders come back comparable.
Stage 04 of 04 · 8 to 20 months
We stay through construction: a weekly site walk, a written report by Friday, and every decision logged so nothing gets lost between the drawing and the wall. Handover comes with a building manual and a return visit twelve months later.
“We stayed open through the whole renovation. They phased the rooms four at a time and we never lost a weekend booking. Occupancy is up 19 points on the year before.”
Most projects start with a visit. Bring a survey, a few photos of the site, or nothing at all.
Our main studio, in a former box factory. Twelve desks, a workshop and the room where most first meetings happen.
Opened in 2021 for our Pacific Northwest work. Home to the model room: about 140 study models from twelve years of projects.
A lot, a building that needs a second life, a hotel that has outgrown itself. Send an address and a few lines; an architect replies within two working days.